Objects
- Show All
- Transport construction
- Ship building and ship repair
- Other objects
- Oil and gas construction
- Hydraulic engineering
- Atomic power
Bridge over the Sochi river
Bridge over the Sochi river, 2013
External surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 240 mkm
Ugorskiy bridge in Surgut
Ugorskiy bridge in Surgut, , 1998 – 2000
External surface:
Zinc-rich primer ZVES – 1х80 mkm
Stelpant-PU-Mica HS – 1х80 mkm
Stelpant-PU-Mica UV – 1х80 mkm
Total thickness 240 mkm
Bridge on the Moscow-Savelovo railway line
Bridge on the Moscow-Savelovo railway line, 2007
External surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 240 mkm
Picket 121-131
Picket 121-131, 3rd phase of Sochi bypass construction, 2009
External surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 240 mkm
Inside surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Total thickness 160 mkm
Bridge over the Moskva river
Bridge over the Moskva river on the 6th km of Moscow-Usovo section of Moscow railway, 2015
External surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 240 mkm
Kuznetskiy bridge
Kuznetskiy bridge in Kemerovo, 2005-2006
External surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 240 mkm
Traffic junction of Yaroslavl highway
Traffic junction of Yaroslavl highway and Moscow Ring Road, Moscow, 1998
External surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 240 mkm
Inside surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Total surface 160 mkm
Overpass 3 of the alternative
Overpass 3 of the alternative of Kurortniy avenue in Sochi, 2012
External surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 240 mkm
Bridge over the Yuribey river
Bridge over the Yuribey river, 2008 – 2009
External surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 240 mkm
Dvortsoviy bridge
Dvortsoviy bridge (Palace bridge) Saint Petersburg, 2012 – 2013
External surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-2К-PU-Mica UV 1х80 mkm
Total thickness 240 mkm
Tanks for crude oil RVS-20 000 m3 Lukoil
Tanks for crude oil RVS-20 000 m3 Lukoil. Varandey terminal, Republic of Komi, Overhaul, 2006
Inside surface:
Stelpant-PU-Zinc – 2×80 mkm
Stelpant-PU-Combination 100 – 2×150 mkm
Total thickness 460 mkm
External surface under thermal insulation:
Stelpant-PU-Zinc – 80 mkm
Stelpant-PU-Mica HS- 80 mkm
Stelpant-PU-Cover UV – 50 mkm
Total thickness 240 mkm
RVSP-30 000 № 34, LPDS Starolikeevo, JSC “AK Transneft”
RVSP-30 000 № 34, LPDS Starolikeevo, JSC “AK Transneft”
External surface:
Stelpant-PU-Zinc – 2×80 mkm
Stelpant-PU-Combination 100 – 2×150 mkm
Total thickness 460 mkm
External surface under thermal insulation:
Stelpant-PU-Zinc – 80 mkm
Stelpant-PU-Mica HS – 80 mkm
Stelpant-PU-Mica UV – 80 mkm
Total thickness 240 mkm
Nevskiy 13, 2006
Nevskiy 13, 2006
System of the coating:
Stelpant-PU-Zinc – 1х80 mkm
Stelpant-PU-Combination 100 – 1х120 mkm
Total thickness 200 mkm
Complex for LHG transshipment
Complex for LHG transshipment on the port Zhelezniy Rog, 2005 – 2007
Piles:
Stelpant-PU-Zinc 2х80 mkm
Stelpant-PU-Combination 100 2х200 mkm
Total thickness 560 mkm
Metal structures above the water:
Stelpant-PU-Zinc 2х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 320 mkm
Bank protection of the embankment
Bank protection of the embankment of the river Angara at the memorial “Eternal flame” to the Ushakovka river in Irkutsk, 2010 – 2011
System of painting:
Stelpant-PU-Zinc – 1х80 mkm
Stelpant-PU-Mica HS – 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 240 mkm
Eastern deep-water pier
Eastern deep-water pier in Novorossiysk, 2008
Piers and sheet pilings:
Stelpant-PU-Zinc 2х80 mkm
Stelpant-PU-Combination 100 2х200 mkm
Общая толщина 560 mkm
LNPP Sosnovy Bor, Confinement of Block A1 (1996), Block A2 (2000)
LNPP Sosnovy Bor, Confinement of Block A1 (1996), Block A2 (2000)
The examination in 2006 did not reveal any damage of the coating
Coating system:
Stelpant-PU-Zinc – 1х80 mkm
Stelpant-PU-Mica HS – 1х80 mkm
Stelpant-PU-Cover UV – 1х60 mkm
Total thickness 220 mkm
The roof of the Temple
The roof of the Temple of the icon of the Mother of God “Unfading color” of the village Rublyovo, Moscow Region.
Roof. Sheet galvanized steel:
Stelpant-PU-Zinc 1×40 mkm Stelpant-PU-Mica UV 1×80 mkm Total thickness: 120 mkm
Lazarevskiy bridge
Lazarevskiy bridge, Saint Petersburg, 2008 – 2009
External surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 240 mkm
Temple in the village of Apraksin
The roof of the Temple in the name of Saint Blessed Prince Alexander Nevsky in the village of Apraksin
Roof. Sheet galvanized steel:
Stelpant-PU-Zinc 1х40 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total thickness 120 mkm
Pipeline system “Eastern Siberia – Pacific Ocean”
Pipeline system “Eastern Siberia – Pacific Ocean” Head facilities UPN-2, RVS 20 000 m3 for crude oil, 2008
External surface:
Stelpant-PU-Zinc – 2×80 mkm
Stelpant-PU-Combination 100 – 2×150 mkm
Total thickness 460 mkm
External surface:
Stelpant-PU-Zinc – 1х80 mkm
Stelpant-PU-Mica HS – 1х80 mkm
Stelpant-PU-Mica UV – 1х80 mkm
Total thickness 240 mkm
RVS 3000m3- ОАО NK Rosneft-Yamalnefteproduct, 2009
RVS 3000m3- ОАО NK Rosneft-Yamalnefteproduct, 2009
External surface 3 layers:
Stelpant-PU-Zinc – 1х80 mkm
Stelpant-PU-Mica HS – 1х80 mkm
Stelpant-PU-Mica UV – 1х80 mkm
Total thickness 240 mkm
Container terminal in Bremerhafen
Container terminal in Bremerhafen, Germany
Stelpant-PU-Zinc 2х80 mkm
Stelpant-PU-Combination 100 2х200 mkm
Total thickness 560 mkm
Protective structure against flooding
Protective structure against flooding on the river Aider, Germany/strong>
Stelpant-PU-Zinc 2х80 mkm
Stelpant-PU-Combination 100 2х200 mkm
Total thickness 560 mkm
Zhivopisniy bridge
Zhivopisniy bridge, Moscow, 2007 – 2008
External surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Stelpant-PU-Mica UV 1х80 mkm
Total surface 240 mkm
Inside surface:
Stelpant-PU-Zinc 1х80 mkm
Stelpant-PU-Mica HS 1х80 mkm
Total thickness 160 mkm